FAI & FAT for the Project DFCCIL – WDFC Phase II
On 12th & 13th September 2022, we had an opportunity to welcome a senior delegation representing the Dedicated Freight Corridor Corporation of India Limited, Project Management Consultancy (PMC), our Contractor and System integrator for witnessing the “First Article Inspection (FAI) & Factory Acceptance Test (FAT)” for Master Clock System to be deployed at DFCCIL Project
We guarantee the functionality of your system!
The objective of Master Clock Systems in this project is to provide precise and reliable time & date information throughout the freight line infrastructure and to display the exact time & date information using Digital Indoor Clocks. We are grateful to all the visitors & witnesses for their great visit & valuable time at our factory in Sumiswald, Switzerland. The inspection, as usual, was successful.
Their support has helped us expand our mission to provide the highest reliability and extensive technology appropriate for synchronization, time-distribution systems, and clocks for Railways / Dedicated Freight Corridors.
At last, we thank all for considering MOBATIME products and services, and we remain committed to a lasting business relationship.
Impressions from the FAI & FAT
MOBATIME products are under inspection.
Elegant and very slim digital clocks for displaying time and date. High protection degree IP54 as standard for all versions. 7-segment LED displays of high luminance provide excellent readability from various angles.